Shipbuilding / offshore

 

3D models, system coordination, fabrication and mounting documentation for a Water Ballast Treatment System instalation (numerous vessels) – prepared for NED Project (2019)

1

 

Detailed design of a Spudcans (Aeolus 2.0) – prepared for VISTAL Offshore Sp. z o.o. (2017)

1

 

Workshop documentation for a Top Side Oil Rig Steel Structure (Johan Sverdrup Drilling Platform) – prepared for VISTAL Offshore Sp. z o.o. (2016)

1

 

Engineering support and detailed design for an Oil Rig Steel Structure (Petrofac FPF1 PLatfrom) – prepared for Gdańska Stocznia „REMONTOWA” S.A. (2013-2014)

1

 

 

 

Preliminary design of a specialist marine scientific research vessel for interdisciplinary research at the Baltic Sea - ordered by University of Gdansk (2011-2012)

 

11

 

 

 

 

Technical project - modification (extension) of floating dock – ordered by Shiprepair Yard Nauta S.A. (2011)

 

1

 

 

 

 

Numerous FEM strength analysis for design of the vessel HLJV (Heavy Lift Jacket vessel) – ordered by CRIST S.A. and StoGda (2011 - 2012)

 

1

 

 

 

 

Technical project of 18m workboat – ordered by Prorem Ltd.(2012)

 

1

 

 

 

 

Technical project for purposes of re-classification offshore object from oil rig to hydrotechnical sea structure – ordered by LOTOS Petrobaltic S.A. (2012-2013)

 

1

 

 

 

 

Workshop documentation – Bridge and Flare offshore structures (Eldfisk 2 Project, Norway) – ordered by VISTAL S.A. (2012 - 2013)

 

11

 

 

 

 

Workshop documentation – Various steel offshore structures (Edward Grieg Project, Norway) – ordered by VISTAL Offshore Sp. z o.o (2013 – 2014)

 

11

 

 

 

 

"TRANSSHIPPER" - Strength Analysis – ordered by Gdansk Shiprepair Yard "REMONTOWA" S.A. and "StoGda" Ship Design & Engineering Sp. z o.o. (2001 - 2002)

 

1

 

 

 

 

Floating Docks - Strength analysis, calculations of carrying capacity - prepared for Gdansk Shiprepair Yard "REMONTOWA" S.A. (2000 - 2001)

 

 

 

 

Strength Analysis of Hull during Ro-Ro Ships conversion to Cable-Ships - prepared for Gdansk Shiprepair Yard "REMONTOWA" S.A. (2001)

 

 

 

 

Strength Analysis of Oil-rig Heli-Deck - ordered by "PETROBALTIC" Sp. z o.o. (2001)

 

 

 

 

Numerous strength analyses of various ship types’ docking and launching, 2004 – still.

 

1

 

 

 

 

A 3D model, coordination and design of pipelines for FPSO vessel, SIRI, 2007, Investor: Gdansk Shiprepair Yard “Remontowa” S.A.

 

1

 

 

 

 

A 3D model, coordination and design of pipelines, design of hull modifications, project of foundations for equipment of a seismic vessel Southern Explorer, 2007-2008, Investor: PROREM Sp. z o.o.

 

1

 

 

 

 

Strength analysis and technology of the conversion process of tankers ”Nilos” and ”Lucky Lady” into heavy lift ships, 2005-2006, ordered by Gdansk Shiprepair Yard “Remontowa” S.A.

 

1

 

 

 

 

Design and strength analysis of concrete hull structure of Houseboat ships, 2006, ordered by Houseboat Ltd.

 

1

 

 

 

 

Strength analysis of the submersible platform ”Sedco” setting on two floating docks, 2005, ordered by Gdansk Shiprepair Yard “Remontowa” S.A.

 

1

 

 

 

 

Strength analysis of the crane on the fishing vessel “Atlantic Preserver”, 2005, ordered by Shipcon Ltd.

 

1

 

 

 

 

A non-linear strength analysis of steel sandwich panels, 2006, ordered by Gdansk University of Technology

 

1