Civil engineering

 

Technical design of a Floating Swimming Pools – prepared for PPU KAROS (2019)

1

 

Multidisciplinary technical and detailed project of a Large Hangar in the line of an existing gantry 120 – 16 t, main demensions: 39,81 m x 102,80 m x 29,265 m (width x length x height) – prepared for CRIST S.A. (2019)

1

 

Multidisciplinary technical and detailed project for a Modernization of Modificated Asphalts Installation at refinery (Lotos Asfalt) – prepared for Lotos Serwis (2019)

1

 

 

Multidisciplinary technical and detailed project of a Movable Hall (field zone GP-512), main dimensions: 20,98 m x 30,56 m x 15,26 m (width x length x height) – prepared for CRIST S.A. (2018)

 

3D model and workshop documentationi of a Acoustic Wall for coal mining industry – prepared for Forsons Group (2018)

1

 

Technical design of a Silo & Radiclone (Wacker Chemie AG) – prepared for ITEK PL Sp. z o.o. (2018)

1

 

Conceptual design of a Floating Dry Dock Gate – prepared for CRIST S.A. (2017)

1

 

Technical design of an industrial Autoclave with double sided closing – prepared for ZKS FERRUM S.A. (2016)

1

 

 

Workshop documentation of bridges steel structures (Sanda – Faroe Islands and Arstabron – Stockholm, Sweden) - ordered by Vistal S.A. (2014-2015)

 

Numerous FEM strength analysis for design of the Underwater Hotel – ordered by Deep Ocean Technology Ltd. (2013)

1

 

 

Technical design of a dry dock moveable barrier - prepared for CRIST S.A. (2011)

11

 

 

Workshop documentation of Gates for water turbines Hissmofors and Degenforsens (Sweden) – ordered by VISTAL (2011)

11

 

 

Workshop drawings, FEM strength analysis, project and technology of installation for a roof steel structure of PGE Arena football stadium in Gdańsk – ordered by Energomontaż Południe S.A. (2009-2010)

11

 

 

Technical supervision at the building site of the extension – reconstruction of the Tricity Shopping Centre ”Klif” in Gdynia, Poland, began in 2008, ordered by Paige Investments Sp. z o.o.

11

 

 

Technical supervision at methyl esters factory building site in Tychy, Poland, began in 2008, ordered by BIOAGRA - OIL S.A.

11

 

 

Technical Supervision at an ethanol factory building site in Goświnowice near Nysa, Poland, began in 2007, ordered by BIOAGRA S.A.

11

 

 

A factory design – extension of the “Izohan” factory including new systems of bitum production, 2006, ordered by Izohan Sp. z o.o.

1

 

 

Technical Supervision at Compressor Stations of Yamal-Europe Gas Pipeline in Ciechanów, Zambrów, Szamotuły - performed for MSS Sp. z o.o. (2004 - 2005)

11

 

 

Supervision at CHP Władysławowo – ordered by "ABB Zamech Gazpetro Sp. z o.o. (2002 - 2003)

11

 

 

Submarine Pipeline at the Baltic Sea, from Oil-rig "Baltic Beta" to the town of Władysławowo (length - 82 km) - Construction Design and Detailed Design, Technical Supervision at the construction site - ordered by "PETROBALTIC" Sp. z o.o. (2001 - 2003)

1

 

 

Technical Supervision at Compressor Station of Yamal-Europe Gas Pipeline - ordered by "ILF" Consulting Engineers Polska Sp. z o.o. (2001 - 2002)